How far in advance do I need to place orders for required interfaces?

  • MU-EH-Stage 1-Interfaces
  • MU-EH-Stage 2-Interfaces
  • MU-EP-Stage 1-Interfaces
  • MU-EP-Stage 2-Interfaces

Orders need to be placed as soon as possible. The minimum lead time for all interface orders is 90 days. Interfaces must be purchased in production prior to the start of the Meaningful Use reporting period.